Long Leads - German Shepherd Dog Forums

Increase font size: 0, 10, 25, 50%

GermanShepherds.com is the premier German Shepherd Forum on the internet. Registered Users do not see the above ads.
Reply
 
LinkBack Thread Tools
Old 09-24-2010, 04:51 PM   #1 (permalink)
Member
 
Join Date: May 2010
Posts: 158
Default Long Leads

Is there something I am missing when using a long lead? It gets tangled up around her legs, around objects, her neck etc. constantly. Also, when using it to recall she runs back faster than I can reel it in, so if I need to correct her I cannot because the line is too slack. When tossing something for her to chase she runs faster than I can let the line out. If I just let her pull it out, it gets tangled up with itself or her legs or some other object.

Any advice is appreciated as I am finding a long lead to cause more problems than it is worth.
Superhero is offline   Reply With Quote
Sponsored Links
Advertisement
 
Reply
Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -4. The time now is 01:39 PM.



Powered by vBulletin® Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.3.2
PetGuide.com
Basset.net DobermanTalk.com GoldenRetrieverForum.com OurBeagleWorld.com
BoxerForums.com DogForums.com GoPitbull.com PoodleForum.com
BulldogBreeds.com FishForums.com HavaneseForum.com SpoiledMaltese.com
CatForum.com GermanShepherds.com Labradoodle-dogs.net YorkieForum.com
Chihuahua-People.com RetrieverBreeds.com